Wind rose
How often the wind blows from each of 16 directions, split by speed at hub height.
Yanbu, Saudi Arabia · 700 MW onshore wind · Windey WD200-7700IW
Real hourly wind from January 2021 to October 2026 at the project area 50 km north-west of Yanbu, a 91-turbine farm, and every step from wind to annual energy. Change an assumption and watch the numbers move.
How often the wind blows from each of 16 directions, split by speed at hub height.
Average wind at hub height for each hour of the day (local time). Arrows show where the wind comes from at that hour: the afternoon sea breeze swings it to the west.
Share of hours in each 0.5 m/s band at hub height, with the fitted Weibull curve.
Mean wind at hub height for each month. The dashed steps are the yearly averages, showing how much one year can differ from the next.
Power law v(z) = v100·(z/100)α, fitted to the 10 m and 100 m data at each hour
At night the desert surface cools and the air near the ground becomes stable, so the wind higher up decouples and α rises. In the afternoon the air is well mixed and the profile is almost flat. The blades of a 200 m rotor on a 115 m tower sweep from 15 m to 215 m, so they meet very different winds at the top and the bottom.
A 7.7 MW, 200 m rotor machine built for hot, dusty, 60 Hz markets. The attached datasheet covers the WD200 family; the 7.7 MW rating, 200 m rotor and 115 m hub come from the Yanbu project announcements, and the rest follows the WD200-7500.
Drag the wind speed. The rotor turns at its modelled speed; above rated wind the blades pitch, so they look thinner from the front.
Modelled from rotor size and rating: Cp ≈ 0.45 below rated, rated power reached at 12.3 m/s, cut-out 25 m/s. Hot air is thinner, so at Yanbu the curve shifts right.
From the attached Windey technical parameters (page 17). The highlighted column is the project turbine.
Each turbine leaves a slower, wider wake behind it. The colours show how much power each turbine makes right now; hover one to read it. Play a typical day or a real week from 2025 and watch the farm respond.
Rows face the prevailing north-north-west wind. Spacing is in rotor diameters (D = 200 m). Wider spacing cuts wake losses but needs more land and cable.
Wind blowing along a row loses the most. Bars are the share of energy lost; the line shows how often each direction blows.
Annual energy using all 5.8 years of hourly wind. Each red step is a loss.
P90 is the energy exceeded in 9 years out of 10: P90 = P50 × (1 − 1.282 σ). The default tariff is the SAR 0.064/kWh reported for the Yanbu PPA.
Net energy for each calendar month, averaged over all years. Summer is the windy season here.
The same farm in each data year. 2026 covers January to October only and is shown at its partial total; it was an unusually windy year in the data.
Expected output at each hour, from the Weibull spread around that hour's mean wind, after wakes and losses. Output peaks in the afternoon and evening, which lines up with Saudi summer demand.
Hourly ERA5 reanalysis from the Copernicus Climate Change Service, retrieved through the Open-Meteo archive API for 24.41° N, 37.71° E, about 50 km north-west of Yanbu city, on land at 108 m elevation (ERA5 grid cell 24.50° N, 37.75° E). Period 1 January 2021 to 31 October 2026, local time (UTC+3), 51,120 hours with no gaps. Variables: wind speed and direction at 100 m, wind speed at 10 m, air temperature at 2 m and surface pressure.
The simulator stores 5.8-year statistics computed from every hour: speed histograms in 0.5 m/s bins, a 16-sector × 1 m/s direction table, hour-of-day averages, shear and air density, for all years, each year and each calendar month. It also stores four real hourly weeks from 2025 for the replay.
Caution. ERA5 has a 0.25° (about 28 km) grid. It smooths the coastal mountains and valleys and often underestimates wind at well-exposed sites. A bankable study would correlate a year or more of on-site met-mast or lidar data with the long-term reanalysis. Use the correction slider to explore that uncertainty.
WD200 family data come from the attached Windey technical parameters. The project's 7.7 MW rating, 200 m rotor, 115 m hub height, the 700 MW capacity and the location about 50 km north-west of Yanbu are from public project announcements; press reports mention 87 turbines, while 91 units are needed for 700 MW at 7.7 MW each. The power curve is modelled (Cp = 0.45 with a smooth approach to rated), not the manufacturer's certified curve, and the thrust curve is generic.